Loaded In…

Before I get into this week’s post, I wanted to just thanks everyone for showing up at our girst gala last weekend. It was a fantastic event filled with food, wine, live music, good company and great dancing…or, at least, enthusiastic dancing. :) And thank you to all of our sponsors. The event was a success because of your generosity!

So, now, on to tech week.

Day started with a realization of how to make a stale bagel taste almost fresh. Here’s how to do it*: Take your stale bagel and microwave it for 15 seconds. Flip it and microwave it again for 15 seconds. Take the bagel out of the microwave, cut it and toast it to desired done-ness. Put whatever topping on it you like and though it has a little bit of that rubbery texture, I challenge you to notice a huge difference between it and a fresh one…that being said, you have to start with a good, high quality bagel. Don’t grab one from dunkin donuts and expect this to work.

*this only works if you like toasted bagels.

Alas, but I digress. No actors today so we just focused on load-in, which went really well:

Costumes came first and have been set up on their rack, ready to be tried on and adjusted at the costume parade tomorrow.

Laura and I cleaned out the backstage and set up the audience into it’s performance configuration (we’re doing something a little different with the seats and we needed to test it out today.) Test went well, looking forward to bringing in the actors.

Sam arrived to start the lighting hang and focus. I’m always amazed watching lighting designers scramble up and down ladders as if there’s nothing remotely uncomfortable about being 15 feet in the air.

Then came Zeljka. We tested the projector and went over notes to make sure we’re all on the same page. It’s getting exciting, people.

Jane came around 5 to pick up costumes that need repairs and alterations and we went through costume stuff together. Tomorrow, she’ll have a new batch of alterations to contend with but we should be in pretty decent shape.

After Jane, in came Ien. She buckled down with Qlab to start getting the cues loaded in. We were doing really well until the speakers turned themselves off, so that’s a problem for tomorrow, definitely.

And finally, Becky arrived, most of the set pieces in hand.  We tested out some paint for the set and got the pieces in place.

All in all, a VERY productive day.

Looking forward to the costume parade and the movement work with Dana tomorrow…not to mention the advances each department will make in their individual techs. And with that…to bed I’m away.

Will try to post another update tomorrow. It’s wild to have so much time for tech…wild and wonderful…but I guess tech is just one of those things – no matter how much time you have, you always want one day more…